the goodman group, ltd.

Wuskwatim hydroelectric generating station, Burntwood River, Manitoba, Manitoba Hydro

Wuskatim Generating Station and Transmission Project

Manitoba Hydroelectric System Planning, Operations, Project Assessment and US Exports

Wuskatim Generating Station and Transmission Project (1999-2005)

On behalf of the Pimicikamak Cree Nation (PCN):
  • Evaluated Manitoba Hydro system planning, environmental review, and disclosure relating to the Churchill-Nelson hydro project
  • Assessed the environmental and other impacts from existing hydro and the proposed 200 MW Wuskwatim hydro project
  • Analyzed the need for comprehensive assessment of the entire Churchill-Nelson project (existing, proposed, and future)
  • Reviewed precedents regarding comprehensive assessment of existing major hydro projects
  • Submitted comments to the Minnesota Public Utilities Commission on Northern States Power’s supply requirements in relation to Manitoba energy exports from Wuskatim.

Download

No public TGG download is available.

Project Categories

No TGG filing available.
N/A
News coming soon.